Triggering a Hard Build
What triggers a Hard Build on our Apps
There are certain changes an app owner will do through our control panel that will trigger a hard build for apps to be resubmitted to iTunes or Google Store after the app owner hits publish.
An app will need to go through a build process and be approved in order for certain changes to take effect. Once approved by iTunes and Google store, these changes will be reflected on the mobile devices after they download the latest version of that app.
Here are the list of changes that will trigger a Hard Build
- Changing the Splash Screen from the Appearance page in the Buildfire Control Panel.
- Changing the App Icon from the Appearance page in the Buildfire Control Panel.
- Changing the App name from the Appearance page in the Buildfire Control Panel.